HQ Infrax West

Offices, Interior, Competition

Newly built office and warehouse with environmental construction
HQ Infrax West
  • Client(s)
    Infrax West (Fluvius West)
  • Construction site
    Torhout
  • Architect team
    Dirk Engelen, Jan Geerts, Evi van Schooneveld
  • Interior team
    Wim Heyninck
  • Main contractor
    Van Laere
  • Competition
    2005
  • Year
    2006-2009
  • Status
    Realised
  • Awards
    Green Good Design 2010 - 2020 Challenge Award 2009, Public Award
  • Photography
    BINST ARCHITECTS, Coolens & Deleuil, Koen Van Damme
  • Press

Headquarters Infrax (current Fluvius)

As a utilities service provider (electricity, natural gas, cable television and sewage system), Infrax (now Fluvius) serves as an important role model for sustainable and energy-efficient construction. The high level of ambition was translated into a conceptual competition design that is totally consistent with Infrax’s corporate identity. The characteristic ecological and sustainable values were translated into a project that is a metaphor of a forest: a multitude of slender concrete trunks topped with a broad green ‘crown’.

The central pillar of the design is the creation of an innovative ‘green’ façade, literally and figuratively, in which many technical functions are integrated. The façade regulates the building’s light, air and sound with its structure that comprises various ‘layers’. The outer layer consists of screen printed glass panels in three colours and three degrees of transparency. The patchwork of all these elements and the sophisticated façade construction afford the building a highly expressive and dynamic character.

The closed aspect of the upper structure contrasts with the transparency and openness of the ground floor, where the semi-public functions and the lunch room are based. The large glass surfaces offer visitors and passers-by a glimpse behind the scenes of what is happening in and around Infrax.

Various eco-innovative techniques are applied in the office building, such as a technical façade with integrated photovoltaic panels, a borehole thermal energy storage system (BTES system) and concrete core activation (CCA). The application of these techniques results in a primary energy saving of 42% and a significant improvement in terms of comfort. The calculated value of the building’s E-level is E60, and the K-value is K44.

Because of the advanced eco-innovative techniques used and its importance for local and regional economic development, the project receives a grant from the European Regional Development Fund (ERDF). The low energy concept of the new Infrax office was also made possible by co-financing from the Flemish Energy Agency and the Department of Environment, Nature and Energy (LNE) of the Flemish government.

News News News News News News News News News News News News News News News News News News News News News News News News News News News News News News News News News News News News News News News News News News News News News News News News News News News News News News News News News News News News News News News News News News News News News News News News News News News News News News News News News News News News News News News News News News News News News News News News News News News News

News

Close

Filtered by category: Web Close

4.4.2024 — BAR news

19.3.2024 — BAR news

11.3.2024 — Newspaper

5.3.2024 — Magazine

4.3.2024 — Book

3.3.2024 — Newsletter

7.2.2024 — Web

6.2.2024 — Book

1.12.2023 — Magazine

29.11.2023 — Newsletter

11.7.2023 — Newsletter

10.6.2023 — Newsletter

28.2.2023 — Newsletter

4.11.2022 — Newsletter

24.10.2022 — Event

3.10.2022 — Newsletter

12.9.2022 — Web

6.7.2022 — Newsletter

28.6.2022 — Web

25.5.2022 — Magazine

23.5.2022 — Web

21.3.2022 — BAR news

10.1.2022 — Magazine

1.1.2022 — BAR news

23.12.2021 — BAR news

10.11.2021 — BAR news

21.9.2021 — BAR news

20.9.2021 — Magazine

14.9.2021 — BAR news

8.9.2021 — BAR news

26.8.2021 — Web

24.8.2021 — BAR news

23.8.2021 — Award

17.6.2021 — Event

7.6.2021 — BAR news

23.2.2021 — Award

8.2.2021 — Web

31.1.2021 — Award

18.1.2021 — Web

19.12.2020 — BAR news

26.11.2020 — Web

13.11.2020 — BAR news

5.10.2020 — BAR news

26.8.2020 — Web

1.8.2020 — Book

23.3.2020 — BAR news

23.3.2020 — BAR news

19.12.2019 — BAR news

27.11.2019 — Event

21.10.2019 — Newspaper

7.10.2019 — Magazine

3.10.2019 — Video

3.10.2019 — Magazine

27.9.2019 — Web

17.9.2019 — Web

16.9.2019 — Web

13.9.2019 — Expo

9.9.2019 — Web

6.9.2019 — Web

4.9.2019 — Newsletter

27.8.2019 — BAR news

16.8.2019 — Web

1.8.2019 — Magazine

15.7.2019 — BAR news

12.7.2019 — Newsletter

9.7.2019 — Magazine

5.7.2019 — Event

5.7.2019 — Magazine

5.7.2019 — Magazine

1.7.2019 — Web

18.6.2019 — Newsletter

14.6.2019 — BAR news

12.6.2019 — Magazine

7.6.2019 — Web

29.5.2019 — Newspaper

24.5.2019 — Web

19.5.2019 — Web

18.5.2019 — Web

15.5.2019 — BAR news

15.5.2019 — BAR news

15.5.2019 — BAR news

15.5.2019 — BAR news

14.5.2019 — Newsletter

9.5.2019 — Newspaper

1.4.2019 — Book

17.1.2019 — BAR news

17.1.2019 — BAR news

17.1.2019 — BAR news

17.1.2019 — Newsletter

11.11.2018 — Magazine

25.10.2018 — Expo

25.10.2018 — Magazine

15.10.2018 — BAR news

TOP